Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Redcar and Cleveland Town Deal, Public Realm

Redcar and Cleveland Town Deal, Public Realm

Recar
£3,690,000.00
45 weeks

CR Reynolds was named Principal Contractor for the Redcar and Cleveland Town Deal project. The scope of the works was to upgrade and improve an existing pedestrianised High Street. The purpose of the scheme was to create a more vibrant High Street that could be used for multi-purpose events. The works included installing site hoarding to the designated work areas and removing the existing clay block paving within the designed extents. New water and electric infrastructure were installed, along with in-ground power and water units to support event use and future flexibility. The high street environment was enhanced through the installation of new street lighting columns and lanterns, together with new signage to improve localised lighting levels and the overall aesthetic. Public realm finishes were upgraded with new granite and limestone set paving, including etched limestone sets featuring a poem by a local poet, coloured bituminous surfaces, new street furniture, and bespoke concrete planters with illuminated lighting and soft landscaping.

Project work elements included:

  • Replaced approximately 2,800m² of clay block paving with natural granite and limestone setts
  • Renewed 58m³ of highway foundation affected by historic utility damage.
  • 26 new lamp columns with LED lanterns, new feeder pillars to increase capacity, and six LED uplighters to illuminate the Grade II listed Redcar Town Clock.
  • Delivered about 330m of non-potable water supply for street cleaning, five in-ground event power units, and approximately 220m of 150mm electrical ducting to serve the units and provide spare capacity.
  • Bespoke illuminated concrete planters with soft landscaping, new trees and bins
  • 3.6m wide benches, increasing seating to 104.
  • Interfaces with the adjacent events space build & day to day trading were managed through regular coordination, weekly business liaison and tightly controlled early morning deliveries, including maintaining overnight delivery access to Boots.
  • Each phase was closed out before hoarding removal to minimise defects
  • Our supply chain was used to increase illumination levels by around 30% using low energy LED lanterns.
  • Value engineering workshops supported best value decisions for paving, street furniture.

The Project Works

Early Contractor Involvement was used to reduce construction risk and protect the High Street trading environment, close collaboration with Southern Green to develop a phased methodology ensured access for businesses, traders and the public. Value engineering workshops supported best value decisions for paving, street furniture, and our supply chain was used to increase illumination levels by around 30% using low energy LED lanterns. Progress and potential impacts were communicated throughout the works with the public liaison officer. Construction works replaced approximately 2,800m² of clay block paving with natural granite and limestone setts and renewed 58m³ of highway foundation affected by historic utility damage.

The public realm upgrade included 26 new lamp columns with LED lanterns, new feeder pillars to increase capacity, and six LED uplighters to illuminate the Grade II listed Redcar Town Clock. The scheme also delivered about 330m of non-potable water supply for street cleaning, five in-ground event power units, and approximately 220m of 150mm electrical ducting to serve the units and provide spare capacity. Place making improvements included bespoke illuminated concrete planters with soft landscaping, new trees, bins and 3.6m wide benches, increasing seating to 104.

Interfaces with the adjacent events space build & day to day trading were managed through regular coordination, weekly business liaison and tightly controlled early morning deliveries, including maintaining overnight delivery access to Boots. Each phase was closed out before hoarding removal to minimise defects. The phasing approach enabled multiple work fronts to run concurrently while maintaining access, resulting in completion 7 months ahead of programme.

Result

CR Reynolds LTD upgraded and improved the existing pedestrianised High Street. The phasing approach enabled multiple work fronts to run concurrently while maintaining access, resulting in completion 7 months ahead of programme.

The Difference We Made

Created a vibrant High Street which can be used for multi-purpose events. New water and electric infrastructure were installed, along with in-ground power and water units to support event use and future flexibility.