Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Railway level crossing improvements

Railway level crossing improvements

20 sites across various locations
£350,000 approx
20 weeks

These works involved the installation of 20no MK2 level crossing fencing around the new bases. The existing crossings were being converted from AOCL (Automatic Open Crossing – Locally monitored) to ones with level crossing barriers that go across the road.

This contract also included the design and build of a retaining wall and all associated works works at Seacroft Level Crossing (near Skegness).

Essentially, the barrier base work was divided into the following 3 sections:

1. Construction of the MK2 bases. This work involved hand excavation works, trench protection, steel and fittings installation, formwork and concreting works. All works had to be carried out under track possessions / Line Blockages with appropriate traffic management in place.

2. The barrier installations required a protection fence surrounding them together with ground improvement works and landscaping around the new barriers position.3. Roadworks; in last phase of works the new kerbs, tactiles, road surface and road markings were installed to bring the existing crossing to new safety standards.

Seacroft Level Crossing

In addition to the barrier bases and associated works, also part of the works was to design and build a retaining wall at Seacroft Level Crossing, Skegness.

Possession requires careful preparation and planning because working time is critical and it is essential that all planned works are carried out during the allotted times. This contract proved to be another successfully completed job with Network Rail.