Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Penny Pie Park Bridge

Penny Pie Park Bridge

Barnsley, South Yorkshire
£1.39million
27 weeks

Our client required a Principal Contractor to deliver this project which included the provision of a new foot and cycle bridge over the existing Barnsley to Huddersfield rail line linking Penny Pie Park to Pogmoor recreation ground, including associated new footways.

Action

  • Utility diversions and drainage
  • Pile foundations
  • Construct reinforced concrete pile caps/ bank seats, and bridge bearings
  • Installation of a new 34.7m long single span bridge
  • Construction of approach ramps and retaining wall
  • Installation of pedestrian and cycle parapet/guardrail
  • Lighting installation
  • New paths and landscaping

Stakeholders

In addition to Network Rail, a key stakeholder on this project was local residents. We worked in close collaboration with the client’s project team to liaise with the local community throughout the project. This included introductory and regular letter drops and daily site-level dialogue with residents. In addition, we also attended a local primary school to deliver two talks related to construction site hazards, including hosting a design a size health and safety poster competition, with the winning student’s design printed and displayed on site. On project completion, we added over £210,000 of social value including community engagement and use of local supply chain.

Challenges and Solutions

The project involved works adjacent and over live Network Rail infrastructure. C.R. Reynolds Limited utilised our rail experience to continually engage with Network Rail, ensuring that all relevant Network Rail standards were adhered to in terms of project delivery, permanent, and temporary works design. We also ensured that relevant project information was available to Network Rail for review and approval in a timely manner to gain necessary approvals to meet programme.

A further challenge on the project was overcoming unanticipated delays in the bridge manufacturing process. On realisation that a potential delay was impending, C.R. Reynolds Limited swiftly acted to re-programme the works and provide additional inhouse resource to the project. This process enabled us to complete elements of the work that were programmed after bridge installation before the bridge was lifted into position. This prompt action ensured we were able to complete the project in a timely manner and meet the planned short night rail track possession to maximise safety and minimise disruption.

Result

We successfully completed this bridge installation project on time, within budget, and to a high quality standard, with excellent feedback received form the client and local people.

The Difference We Made

Installation of this bridge will support ‘active travel’ in the region, whilst providing residents with a safe pedestrian and cycle route across busy railway lines for years to come.