Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Middlesex Road, Carriageway Improvements

Middlesex Road, Carriageway Improvements

Hull
£868,000
23 weeks

CR Reynolds Ltd were appointed as Principal Contractor to deliver essential infrastructure upgrades on Middlesex Road, Hull. The scheme was undertaken within a phased traffic management system to minimise disruption and maintain access to adjacent properties.The project aimed to improve traffic flow, enhance pedestrian safety, and upgrade surface water management, while ensuring long-term durability of the road network.

Action

  • Road widening to increase capacity and improve traffic flow.
  • Renewal of kerbs and footpaths.
  • Targeted structural repairs to the rigid carriageway.
  • Full resurfacing of the carriageway.
  • Installation of new traffic calming measures, including speed ramps.
  • Relocation of existing street lighting columns.
  • Comprehensive drainage improvements.
  • Installation of tactile crossing points and a new traffic island on Salthouse Road.

The Project Works

Works commenced with the planing off of the existing surface to expose the underlying concrete carriageway. This enabled detailed inspection of the base and identification of sections requiring repair.

Defective areas of concrete were carefully excavated, stabilised with blinding concrete, and reconstructed using dowelled, reinforced concrete at 300mm centres to restore strength and durability.

In parallel, the road widening programme was delivered through reinforced concrete construction, ensuring compliance with design specifications and providing capacity for future demand.

Drainage and Surface Water Management

Surface water management was a key focus of the project. Over 90 gullies were installed, removed, or adjusted as part of the works. New gullies were connected into the existing system, creating an upgraded drainage network to efficiently manage rainfall and the increased surface water owing to enhancement of the catchment area.

Kerb and Footpath Enhancements

Approximately 1,000m of new kerbs were installed, including double-kerb detailing to accommodate level changes associated with road widening and realignment. Existing footpaths were also excavated and reconstructed, providing pedestrians with a safe and durable new walking surface.

Result

The project was delivered ahead of programme and produced a high quality, defect free finish to the standards of our client and the adopting authority Hull City Council. The finished project earned recognition from the Hull Civic Society owing to the “excellent completion of works on Middlesex Road.

The Difference We Made

The scheme successfully delivered a safer, more efficient corridor through Middlesex Road, enhancing both vehicular and pedestrian movement. The combination of structural repairs, traffic calming, and improved drainage ensures long-term resilience of the route, while minimising disruption to local residents and businesses during construction.