Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Hostile Vehicle Mitigation (HVM) Project, York

Hostile Vehicle Mitigation (HVM) Project, York

York
£3.15million
12 months

The city of York attracts around 8.9million visitors on an annual basis and is home to many historic buildings and world famous attractions. Our client required an experienced Principal Contractor to supply and install hostile vehicle mitigation (HVM) measures across several key locations around the city.

Action

  • Temporary traffic management
  • Site clearance and excavation
  • Existing service diversions
  • Construction of bespoke bollard foundations
  • Installation of new static and electromechanical moveable bollards
  • Electrical installation and commissioning
  • Reinstatement of disturbed surfaces

Stakeholders

Due to the extremely busy nature of working within a city centre environment, there was a multitude of different stakeholders involved on this project including road users, residents, business owners, and tourists.

To effectively manage stakeholder engagement, we appointed a locally based Project Liaison Officer who maintained responsibility for engaging with all external project stakeholders throughout. Adopting this strategy added essential local knowledge to the Project Delivery Team, ensured proactive engagement, and minimised concerns raised.

Challenges and Solutions

We were often working in areas of high footfall, in close proximity to the public and occupied premises. All work locations were segregated with pre-agreed, Chapter 8 compliant traffic management arrangements, allowing for safe passage or diversion of the public. This was supplemented by pre-start and ongoing PLO engagements with surrounding businesses and residents.

A myriad of existing below ground services passed through site areas; these often required diversions and close collaboration with service providers. Thanks to our meticulous planning, identification, and safe excavation methods, often in highly restricted working zones, we were able to trace, excavate, and safely divert any existing services without disruption.

 We worked in close collaboration with the client, designers and subcontractors to overcome various design changes posed by unforeseen below ground obstructions, and providing various value engineered solutions to required design changes.

Result

Working collaboratively with the appointed HVM bollard supplier, all installations have been successfully completed to a high standard, with minimal impact on residents and businesses.

The Difference We Made

These HVM works seamlessly integrate with York’s historic aesthetics. The bollard installations will continue to serve as a visual deterrent against vehicle-borne terrorist threats and increase property and public safety for years to come.