Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Holmeside Bus Rationalisation Project

Holmeside Bus Rationalisation Project

Sunderland
£3.83 million
71 weeks

As part of the ongoing regeneration works in Sunderland city centre, our Client required an experienced Principal Contractor to create a new gyratory system and bus priority along key locations within the Holmeside area.

Action

  • Traffic management
  • Site clearance
  • Surface water drainage installation
  • Ironwork alterations
  • Service ducting and chambers
  • Earthworks
  • Footpath and carriageway reconstruction
  • Rain garden construction
  • Kerbing, edging, paving and tactile installation
  • Removal of existing road markings
  • Paving
  • Permanent traffic signals
  • Tree pits and landscaping
  • Surfacing and road markings

Stakeholders

Key stakeholders on this project included pedestrians, road users, and occupiers of the many properties located along each route.

Working in collaboration with our approved traffic management contractor and the Client, we established phased traffic management to minimise impact on pedestrians and road users. This was supplemented by our resident Site Manager who consulted daily with individual property occupiers whose access requirements were integrated into phasing and programme.

Through proactive engagement with the local community, significant social value was added to this project, this included multiple site-based work experience placements for local students and attending Sunderland College to take part in their annual careers fair event. We also employed a number of local people including the Site Manager, Engineer, and local labour.

Challenges and Solutions

Due to the works being undertaken in a predominantly high-street environment, maintaining public safety and access to occupied buildings was critical. Client imposed constraints included uninterrupted use of roads, and one footpath remaining in use at all times during the works.

We adopted an early engagement strategy with our proposed traffic management subcontractor and the Client to develop and approve traffic management plans.

Works were intricately phased to allow uninterrupted access to occupied properties, with occupiers consulted throughout.

By prior agreement, some works were undertaken out of normal site working hours to minimise risk and disruption.

Result

Successful handover over this high quality project, achieved through implementing our ISO compliant policies and procedures, coupled with self-delivery of key civils aspects of the project, and continual liaison with the Client’s project management team.

Thanks to the success of our works at Holmeside, late in the programme we were awarded additional paving works around the new Sunderland Train Station. We worked in close collaboration with the Principal Contractor for the station build to programme and provide resources for this work.

The Difference We Made

The Holmeside and station improvements are part of the council's continuing commitment to the ‘City Plan’ for a more dynamic, healthy and vibrant city. The new road layout reduces congestion in the city centre, giving buses more priority and improving their journey times and reliability, and enhancing how pedestrians use this part of the city centre.